FREQUENTLY ASKED QUESTIONS

We provide a transparent experience for each of our customers.
PROVIDING INFORMATION AND ANSWERS ANYTIME

At Integrity, we want to provide a transparent experience for each of our customers by providing information and answering any questions you might have. Feel free to contact one of our salespeople if you have additional questions.

Our buildings start at 24′-110′ clearspan widths and unlimited lengths.
As a rule of thumb, our posts go between 4’ – 5’into the ground.
We can design our buildings along with you to meet almost any of your needs. We take the time to listen to your concerns, objectives and dreams — the key to designing a building you want. This is the only way to ensure a plan truly matches your needs. Our experienced salespeople will work with you to make certain your design comes to life in the most effective way.
We need at least 15′ wide clearance-all around a building. The salesperson you work with will help you determine space required to build.
The advantage of a post frame building is that your building can be built with no concrete foundation. A concrete floor can be installed at any time in the future without any change in design by using our standard 2’ x 8’ PWF bottom board.
We use 2″ x 6″, 24″ on center.
For walls, we use R28. For ceilings, we use R40.
We use bright white coloured metal for our interiors. This maintenance-free interior allows for the electrical to be surface mounted in conduit, providing easy access in the future and without comprising the vapour barrier.
Yes, gable vents are usually used.

It depends on the time of year as some seasons are busier than others. The best way to determine how much lead time you will need is to contact one of our salespeople.

Our buildings are engineered to handle the snow load to your local conditions across Canada.

Yes, we offer material-only packages. Please contact one of our salespeople for more information.

No! Perma-Columns® are poured in a controlled environment using the latest pre-casting and curing technology. Additives are incorporated to enhance strength, density, corrosion and freeze-thaw resistance, yielding a Hi-Dense concrete that has a compressive strength of 10,000 psi. Concrete is the most proven foundation material known to man with centuries of success.

There are four strands of 1/2″ or 5/8″ (depending on the model) of weld-grade rebar, robotically welded to the steel “U” bracket running the entire length of the concrete pre-cast.
We place a laser level on top of the auger head as the post holes are dug to ensure that all holes are a uniform depth. We then backfill the bottom of the holes with tamped stone before setting posts for greater accuracy.
Most current generation treated wood available today is designed to minimize corrosion. However, if you have a high moisture application or are concerned with this problem, we can place a barrier between the treated wood and steel bracket, and use stainless steel fasteners.
We position the splash board against the pre-cast concrete column, pre-drill a 3/16″ diameter hole through the splash board and 2″ into the concrete, then drive a split-drive anchor to attach. Stainless steel drive anchors are required for highly corrosive wood treatments.

Perma-Columns® are slightly wider in the dimension that resists lateral loads. This decreases embedment requirements and are generally designed to have a base depth equal to or less than a standard wood column.

It is recommended that the same type and size of footing used for a wood support column be used as a footing for a Perma-Column® to ensure that proper load-bearing requirements are achieved.

CREWS WITH INTEGRITY
You’ll notice the difference with an Integrity post frame crew from the moment they arrive on your site. Their attention to detail, skill level and lastly — but just as importantly — the respectful way they interact with our clients. If you need service down the road, we are just a phone call away. Our level of service stands out in the industry. It’s our everyday way of doing business.

MOVERS & SHAKERS AWARD FOR 2010 FROM ALBERTA CONSTRUCTION MAGAZINE

Jerry Myer of Integrity Post Structures received the Movers & Shakers Award for 2010 from Alberta Construction Magazine.

AG INNOVATION 2014 WINNER

Agri-Trade’s Equipment Expo Ag Innovation Winner – Integrity Post Structures with their winning submission Perma-Column.

2017 ALBERTA BUSINESS AWARDS OF DISTINCTION

Alberta Chamber of Commerce, Young Entrepreneur Award of Distinction Winner – Integrity Post Structures.

INTEGRITY'S CEO ACCEPTED INTO ELITE NATIONAL PROGRAM

Jerry Myer, Owner/CEO has been selected to participate in the 2017 QuantumShift program. QuantumShift is an exclusive invitation-only leadership development program for 40 of Canada’s most promising entrepreneurs. Founded by KPMG Enterprise and the Ivey Business School at The University of Western Ontario, QuantumShift uses Ivey’s highly regarded case study method and award-winning faculty to help take the skills and talents of these entrepreneurs to the next level.

Integrity Buildings wins in two categories for the 2018 NFBA Building of the Year Awards.

The NFBA (National Frame Building Association) has awarded Integrity Buildings with two 2018 North American Building of the year awards. The winner categories are “Hobby Shop” and “Institutional Building”.

Jerry Myer, Founder & CEO of Integrity says “Since day one at Integrity, we have made it our goal to not only be the best post frame builder in Canada, but develop new and innovative ways to make the industry better. These awards are an honour and we are proud to win, but they are also a testament to the hard work and dedication of an entire team to achieve our goals.”

Myer also added “Every building Integrity builds is custom. That means our customers get our industry leading expertise and are able to add their own ideas to truly make their building something that can be proud of for generations”.